Carbon Reduction Plan 2026
Prepared in line with PPN 006.
Supplier name: Home Connections Lettings Limited
Publication date: 3rd November 2026
Commitment to achieving net zero
Home Connections Lettings Limited is committed to achieving net zero emissions by 2035.
Baseline emissions footprint
Baseline emissions are a record of the greenhouse gases that have been produced in the past and were produced prior to the introduction of any strategies to reduce emissions.
Baseline emissions are the reference point against which emissions reduction can be measured.
| Baseline year | 2025 |
| Additional details relating to the baseline emissions calculations | |
| Our first Carbon Reduction Plan was published in May 2025, so our first reporting period (2025) is our baseline. Office gas and electricity are included in our rent and were estimated at 3.5 kgCO2e per desk per working day for 7 desks, reported together as Scope 2. Upstream and downstream transportation were in scope but not material, and home working was not included. The baseline is kept as originally reported; see “Changes to calculation methods” for how later years are calculated. | |
| Emissions | Total (tCO2e) |
|---|---|
| Scope 1 | 0.00 |
| Scope 2 | 6.15 |
| Scope 3 (included sources) | Waste: 0.75 Business travel: 0.90 Employee commuting: 0.22 Upstream transportation & distribution: 0.00 Downstream transportation & distribution: 0.00 Total Scope 3: 1.87 |
| Total emissions | 8.02 |
Current emissions reporting
Reporting year: 2026 (Jan–Dec 2026)
| Emissions | Total (tCO2e) |
|---|---|
| Scope 1 | 1.36 |
| Scope 2 | 0.77 |
| Scope 3 (included sources) | Waste: 0.01 Business travel: 3.39 Employee commuting: 0.02 Upstream transportation & distribution: 0.00 Downstream transportation & distribution: 0.00 Total Scope 3: 3.43 |
| Total emissions | 5.55 |
Employee home working is optional under PPN 006 and is not included above. We estimate it at 19.47 tCO2e for 2026.
Changes to calculation methods
Office energy: our gas and electricity are included in our rent, so are not metered. In 2025 they were estimated at 3.5 kgCO2e per desk per day, assuming all 7 desks were used every working day (6.15 tCO2e, all reported as Scope 2). From 2026 we estimate them from CIBSE TM46 office energy benchmarks for 7 desks, staff in the office 15% of the time and a 30% base load, using current government conversion factors, with gas reported under Scope 1 and electricity under Scope 2. This change of method on its own reduces office emissions by 4.02 tCO2e (0.89 t from switching to benchmarks and 3.13 t from reflecting office attendance).
Business travel: we do not hold a breakdown of journeys, so from 2026 business travel is estimated from total travel spend (£7,102) using Defra spend-based factors for rail and flights and the 45p mileage rate for car claims, assuming 90% rail, 10% mileage and 0% flights. Applied to 2025 spend (£7,102), this method gives 3.49 tCO2e against the 0.90 tCO2e originally reported, a difference of +2.59 tCO2e.
Waste: our waste is not weighed. In 2025 it was reported as 0.75 tCO2e. From 2026 we estimate it from the bins emptied: 1 standard office bin a week × 0.7 kg (mostly paper, as staff take food waste home) × 52 weeks = 36 kg a year, with 52% recycled. This gives 0.009 tCO2e, a difference of −0.74 tCO2e, which reflects the change of method rather than a change in the waste produced.
Overall, these changes of method account for −2.17 tCO2e of the −2.47 tCO2e change against the baseline. The 2025 baseline is kept as originally reported.
Emissions reduction targets
In order to continue our progress to achieving net zero, we have adopted the following carbon reduction targets.
We project that carbon emissions will decrease to 4.01 tCO2e by 2030. This is a reduction of 50% against our 2025 baseline of 8.02 tCO2e.
These are supported by environmental objectives set under our ISO 14001 Environmental Management System and reviewed at least twice a year at Management Review. Progress against our targets is shown below:
<
Carbon reduction projects
Completed carbon reduction initiatives
The following environmental management measures and projects have been completed or implemented since the 2025 baseline. Our 2026 emissions are 2.47 tCO2e (31%) lower than the 2025 baseline, largely reflecting the changes of calculation method described above, and the measures will be in effect when performing the contract.
- ISO 14001:2015 certification: in 2026 we achieved ISO 14001 certification for our Environmental Management System, certified by British Assessment Bureau, covering the design, development, hosting and support of our SaaS/PaaS solutions and consultancy services, our London office and remote working, and relevant outsourced data centre services and suppliers. Certificate: 271963, 5th May 2026.
- Environmental Policy: a combined Environmental, Carbon Reduction and Sustainability Policy approved by top management in December 2025, aligned to the ISO London Declaration on climate change.
- Aspects & Impacts Register: 31 environmental aspects identified and controlled, including digital aspects such as hosting energy, data and log retention, backup storage and database growth.
- Objectives, targets and monitoring: SMART environmental objectives with owners and KPIs, internal audit, and Management Reviews at least twice a year.
- Supplier screening: environmental criteria included in procurement, with new suppliers assessed using our supplier screening form.
- Office consolidation and remote working: downsized from three offices to one, with staff working from home around 85% of the time, significantly reducing office energy and commuting. Service management meetings are held online wherever possible.
- Energy-efficient office and IT: LED lighting in our office; Energy Star laptops aligned with UK government environmental IT standards; no staff printers issued.
- Efficient hosting: UK-only cloud infrastructure managed by Digital Space (Telford, with disaster recovery in Newport, Shropshire), and the LocalGov Drupal framework for websites. One customer site achieved an “A” carbon rating.
- Home working guidance: home energy good-practice guidance and staff environmental awareness training.
- Travel and community: cycle-to-work bike subsidy; reusable mugs and refillable bottles; paid leave and match funding for environmental volunteering; donations supporting local biodiversity.
Future carbon reduction initiatives
In the future we hope to implement further measures such as:
- Better data: actual office attendance, our share of the building’s energy from the landlord, and a breakdown of business travel by type.
- Digital waste reduction: reducing redundant data storage, quarterly purge cycles, shorter retention for low-risk logs, removing duplicate backups and optimising API traffic.
- Hosting supplier data: obtaining annual energy mix and Power Usage Effectiveness (PUE) data from our hosting provider.
- Business travel: travel justification with public transport first, and remote meetings as the default.
- Office energy and waste: switch-off campaigns, improved recycling signage and quarterly waste audits.
- Home working: measuring home-working emissions and continuing energy-saving guidance for staff.
Declaration and sign off
This Carbon Reduction Plan has been completed in accordance with PPN 006 and associated guidance and reporting standard for Carbon Reduction Plans.
Emissions have been reported and recorded in accordance with the published reporting standard for Carbon Reduction Plans and the GHG Reporting Protocol corporate standard and uses the appropriate government emission conversion factors for greenhouse gas company reporting.
Scope 1 and Scope 2 emissions have been reported in accordance with SECR requirements (where required), and the required subset of Scope 3 emissions have been reported in accordance with the published reporting standard for Carbon Reduction Plans and the Corporate Value Chain (Scope 3) Standard.
This Carbon Reduction Plan has been reviewed and signed off by the board of directors (or equivalent management body).
Signed on behalf of the supplier:

Name and position: Ninesh Muthiah, Chief Executive Officer
Date: 3rd November 2026